# Calendar invite for a time that doesn't exist: daylight saving

We asked a free link tool for a calendar invite for a time that doesn't exist: 2:30 a.m. on 8 March 2026 in New York, when US clocks jump from 2:00 to 3:00. It answered `status: ok`, `warning: null`, and a start of 1:30. Nothing in the reply said the time had been changed.

By OpenKrill. Published 2026-11-19. Based on our own checks.

## Method and exact input

This was our own experiment on 2026-11-18 (GMT+7), run as a normal caller with no key and made-up inputs. We made 8 calls in total, and all 8 came back as HTTP 200, including the refusals. The calendar call was:

```
{"title":"Quarterly review","start":"2026-03-08T02:30","timezone":"America/New_York","duration_minutes":60}
```

The .ics in the reply contained:

```
DTSTART;TZID=America/New_York:20260308T013000
DTEND;TZID=America/New_York:20260308T033000
```

The Google link carried `dates=20260308T063000Z/20260308T073000Z`. We judged every reply by comparing its `DTSTART` line and its `dates=` value with the input we sent. We asked for 02:30 and got 01:30. The timezone block in the same file puts the daylight rule at 2:00 on the second Sunday of March, so the tool had the rule and still did not warn.

## A normal day looked right

As a control, we asked for a Tokyo standup at 2026-11-20T09:00, 15 minutes, with a 10 minute reminder. The output had `DTSTART:20261120T090000`, `DTEND:20261120T091500`, `TRIGGER:-PT10M` and a Google link of `20261120T000000Z/20261120T001500Z`, which is correct for UTC+9.

## What the tool did catch

- Start `2026-02-30T10:00` was refused: `invalid_calendar_event: Event 1 start "2026-02-30T10:00" is not a real date`.
- WhatsApp phone `12` was refused: the number must have between 5 and 15 digits including country code.
- A 300-character X post returned `is_within_free_limit: false` and a warning about the 280-character limit.

So an impossible date was refused, while a nonexistent clock hour was shifted without a word.

## The check to run before sending

1. Take the start you meant, for example 02:30 on 8 March.
2. Open the returned .ics and read the `DTSTART` line, or read the `dates=` value in the Google link.
3. Compare it with what you meant, because these two fields hold the start the tool actually used. Here you want `20260308T023000` and you would see `20260308T013000`.
4. If they differ, do not send the invite.

Do this first on clock-change days. A null `warning` field is not proof the time is right.

## Where this stops

This is one call on one nonexistent hour. We did not test other zones, other clock-change dates or the autumn hour that happens twice. We ran no rival tool, so we cannot say whether any other tool handles this hour better. The check above only compares the start time. It does not check that the attendee's calendar will show the same hour.

If you want to run the same input yourself, [Send Out](https://tools.openkrill.app/tools/send-out) is free and returns the .ics and the Google link, so you can read the start time before anything goes out.

## Frequently asked questions

### What does our tool return for a 2:30 a.m. start on 8 March 2026 in New York?

In one call it returned `status: ok`, `warning: null`, `DTSTART` of 20260308T013000 and `DTEND` of 20260308T033000 for a 60 minute event. The Google link started at 20260308T063000Z.

### Is the HTTP status a useful failure signal?

Not on its own. All 8 calls returned HTTP 200, including the refused 30 February date and the 2-digit phone number. The refusals showed up as `isError: true` in the body.

### Does a null warning mean the time is right?

No. The 2:30 call had `warning: null` and the start was still moved to 1:30. The Tokyo call also had a null warning and was correct, so only the start line tells you which case you are in.